Healthcare
UMPC EAST MEDICAL CENTER | Monroeville, PA
- HVAC / Plumbing / Medical Gas
- 293,000 sq. ft – 6 floors
- 2,250 ton Chilled Water Plant
- 1,893 BHP Boiler Plant
- 66,000 linear feet HVAC Piping Systems
- 410,000 lbs HVAC sheet metal duct systems
- 90,000 linear feet plumbing piping systems
- 31,000 linear feet medical gas piping systems
- BIM coordination including modeling of piping down to ½”
UPMC Vision and Rehabilitation Hospital at UPMC Mercy
- 410,000 sq. ft – 9 occupied levels
- Eight operating suites, Wet labs and Vivarium
- Our scope: HVAC / Plumbing / Medical Gas
- High Pressure Steam and Chilled Water from district energy plant
- Chilled Water, Heating Water and Steam distribution systems
- Glycol heat recovery systems
- Twenty-four Air Handling Units
- 67,000 linear feet HVAC Piping Systems
- 79,000 linear feet plumbing piping systems
- 22,000 linear feet medical gas piping systems
- Full BIM coordination with all trades
UPMC MERCY HOSPITAL | Pittsburgh, PA
- Renovations for New MRI and CT Space
- Patient Care Room Renovations-Floors 6E, 7A-7F, 14 and 6A-6F
- Operating Room Family Lounge
- Burn Hydro Exam Rooms
- CV ICU Patient Room Renovations
- S7 Air Handler Replacement
- Patient Toilet Room Upgrades-Floors 10-12
- Pre-Op Medical Gas Renovations
- 8th Floor Building E Plumbing Renovations
- Medical Office and Imaging Spaces-Ground Floor
ST. CLAIR HOSPITAL | Pittsburgh, PA
- Affiliate building renovations
- Histology Department Renovations
- AHU for Mt. Lebanon Surgery Center
- Storm Sewer Replacement
- UPMC St. Clair Cancer Center
- AHU Dehumidification Modifications for Operating Rooms
- AHU for Mt. Lebanon Surgery Center
- Operating Room 1 and Procurement Room in POB Building
- Operating Room Locker Room